Pelico case study, spares distribution: from 30 disconnected systems to 1 live map

How an aerospace spare parts operation unblocked $11M in open orders in three months

Every morning, analysts triaged hundreds of live orders across 30+ disconnected tools, with no way to tell which urgent orders were really urgent. Pelico ranked the order book by business impact and moved escalation and supplier outreach into one hub. Live on ERP in 2.5 weeks, it delivered $14M+ in measured impact within a few months.

How an aerospace spare parts operation unblocked $11M in open orders in three monthsEvery morning, analysts triaged hundreds of live orders across 30+ disconnected tools, with no way to tell which urgent orders were really urgent. Pelico ranked the order book by business impact and moved escalation and supplier outreach into one hub. Live on ERP in 2.5 weeks, it delivered $14M+ in measured impact within a few months.

How a leading aerospace MRO shop cut part shortages by 73% during a ramp-up

To leverage its data and simplify its daily routines during a steep ramp-up, this industry-leading MRO shop used Pelico’s Manufacturing Orchestration Platform. Within 11 weeks, it cut part shortages by 73% and WIP by 18%, raised team productivity by 80%, and reached a 97% user adoption rate.

How a leading aerospace MRO shop cut part shortages by 73% during a ramp-upTo leverage its data and simplify its daily routines during a steep ramp-up, this industry-leading MRO shop used Pelico’s Manufacturing Orchestration Platform. Within 11 weeks, it cut part shortages by 73% and WIP by 18%, raised team productivity by 80%, and reached a 97% user adoption rate.
Pelico case study, component repair: a 23% ramp-up, zero extra hires

How an aerospace MRO shop in Asia-Pacific absorbed a 23% repair order ramp-up without additional resources

To absorb a steep repair order ramp-up (+23%), this aerospace MRO shop used Pelico’s Manufacturing Orchestration Platform to leverage its data. Its teams cut turnaround time and part shortages, and improved cross-functional collaboration and data-driven decisions.

How an aerospace MRO shop in Asia-Pacific absorbed a 23% repair order ramp-up without additional resourcesTo absorb a steep repair order ramp-up (+23%), this aerospace MRO shop used Pelico’s Manufacturing Orchestration Platform to leverage its data. Its teams cut turnaround time and part shortages, and improved cross-functional collaboration and data-driven decisions.
Pelico case study, HVAC equipment: 93% clear to build in 8 weeks

How a US industrial equipment manufacturer reached a 93% clear-to-build rate in eight weeks

Facing a strong ramp-up in production, this leading US-based HVAC industrial equipment manufacturing group used Pelico’s Manufacturing Orchestration Platform to leverage its data. Within eight weeks, it reached a 93% clear-to-build rate, cut part shortages by 30%, and improved on-time delivery by 12%.

How a US industrial equipment manufacturer reached a 93% clear-to-build rate in eight weeksFacing a strong ramp-up in production, this leading US-based HVAC industrial equipment manufacturing group used Pelico’s Manufacturing Orchestration Platform to leverage its data. Within eight weeks, it reached a 93% clear-to-build rate, cut part shortages by 30%, and improved on-time delivery by 12%.
Pelico case study, aftermarket and MRO: from 53% to 93% data accuracy

How an aerospace MRO provider improved its data quality from 53% to 93% in 8 weeks

This aerospace MRO manufacturer was losing productivity, decision quality, collaboration, and revenue to inaccurate data in its ERP. With Pelico’s Manufacturing Orchestration Platform, it improved its data hygiene from 53% to 93% within eight weeks, and made clean data a cornerstone for daily decisions.

How an aerospace MRO provider improved its data quality from 53% to 93% in 8 weeksThis aerospace MRO manufacturer was losing productivity, decision quality, collaboration, and revenue to inaccurate data in its ERP. With Pelico’s Manufacturing Orchestration Platform, it improved its data hygiene from 53% to 93% within eight weeks, and made clean data a cornerstone for daily decisions.
Pelico case study, aerospace and defense: productivity up 80%, WIP down 18%

How a leading aerospace manufacturer cut WIP by 18%

This leading aerospace manufacturer partnered with Pelico to tackle supply chain disruptions head-on. Starting with six production controllers in one plant, it grew to 120 users across seven teams and two plants in nine months: a silent transformation that cut WIP by 18%, halved logistics cycle times, and raised team productivity by 80%.

How a leading aerospace manufacturer cut WIP by 18%This leading aerospace manufacturer partnered with Pelico to tackle supply chain disruptions head-on. Starting with six production controllers in one plant, it grew to 120 users across seven teams and two plants in nine months: a silent transformation that cut WIP by 18%, halved logistics cycle times, and raised team productivity by 80%.