Skip to main content

Resources

Articles

Article

4

min

read

pelico-news

Pelico Included in Multiple Gartner® Supply Chain Research Publications in 2026

Pelico Included in Multiple Gartner® Supply Chain Research Publications in 2026A Transmission System MRO increases OTD by 15%, decreases WIP by 18%

Article

6

min

read

manufacturing-operations

When the Plan Breaks, Someone Still Has to Decide

When the Plan Breaks, Someone Still Has to DecideA Transmission System MRO increases OTD by 15%, decreases WIP by 18%

Article

7

min

read

ai-digital-transformation

What the Autonomous Era Actually Demands From Manufacturers

What the Autonomous Era Actually Demands From ManufacturersA Transmission System MRO increases OTD by 15%, decreases WIP by 18%

Case studies

Pelico case study, spares distribution: from 30 disconnected systems to 1 live map

How an aerospace spare parts operation unblocked $11M in open orders in three months

Every morning, analysts triaged hundreds of live orders across 30+ disconnected tools, with no way to tell which urgent orders were really urgent. Pelico ranked the order book by business impact and moved escalation and supplier outreach into one hub. Live on ERP in 2.5 weeks, it delivered $14M+ in measured impact within a few months.

How an aerospace spare parts operation unblocked $11M in open orders in three monthsEvery morning, analysts triaged hundreds of live orders across 30+ disconnected tools, with no way to tell which urgent orders were really urgent. Pelico ranked the order book by business impact and moved escalation and supplier outreach into one hub. Live on ERP in 2.5 weeks, it delivered $14M+ in measured impact within a few months.
Pelico case study, HVAC equipment: 93% clear to build in 8 weeks

How a US industrial equipment manufacturer reached a 93% clear-to-build rate in eight weeks

Facing a strong ramp-up in production, this leading US-based HVAC industrial equipment manufacturing group used Pelico’s Manufacturing Orchestration Platform to leverage its data. Within eight weeks, it reached a 93% clear-to-build rate, cut part shortages by 30%, and improved on-time delivery by 12%.

How a US industrial equipment manufacturer reached a 93% clear-to-build rate in eight weeksFacing a strong ramp-up in production, this leading US-based HVAC industrial equipment manufacturing group used Pelico’s Manufacturing Orchestration Platform to leverage its data. Within eight weeks, it reached a 93% clear-to-build rate, cut part shortages by 30%, and improved on-time delivery by 12%.

How a leading aerospace MRO shop cut part shortages by 73% during a ramp-up

To leverage its data and simplify its daily routines during a steep ramp-up, this industry-leading MRO shop used Pelico’s Manufacturing Orchestration Platform. Within 11 weeks, it cut part shortages by 73% and WIP by 18%, raised team productivity by 80%, and reached a 97% user adoption rate.

How a leading aerospace MRO shop cut part shortages by 73% during a ramp-upTo leverage its data and simplify its daily routines during a steep ramp-up, this industry-leading MRO shop used Pelico’s Manufacturing Orchestration Platform. Within 11 weeks, it cut part shortages by 73% and WIP by 18%, raised team productivity by 80%, and reached a 97% user adoption rate.

Guides & Whitepapers

How Elevator OEMs Close the Execution Gap Between Planning and Field Operations

New installations and services both fail with a single missing part.

How Elevator OEMs Close the Execution Gap Between Planning and Field OperationsNew installations and services both fail with a single missing part.

Execution, Not Capacity, Is the Real Bottleneck in A&D

Capacity isn't the constraint — execution is. And most A&D operations haven't fixed it yet.

Execution, Not Capacity, Is the Real Bottleneck in A&DCapacity isn't the constraint — execution is. And most A&D operations haven't fixed it yet.

How MRO Leaders Protect Availability and Turnaround Time Under Structural Volatility

The backlog is full. The execution model isn't keeping up.

How MRO Leaders Protect Availability and Turnaround Time Under Structural VolatilityThe backlog is full. The execution model isn't keeping up.

Events & Webinars

Executive Dinner & Roundtable, Milan

November 25, 2026

Milan, Italy

event

An invite-only executive roundtable in Milan, where supply chain and operations leaders discuss how to protect on-time delivery when the plan stops matching reality.

Executive Dinner & Roundtable, MilanAn invite-only executive roundtable in Milan, where supply chain and operations leaders discuss how to protect on-time delivery when the plan stops matching reality.

American Aerospace & Defense Summit 2026

December 3, 2026

Glendale, Arizona, USA

event

Order books are full and rates keep climbing. Two days with A&D leaders on what it actually takes to deliver.

American Aerospace & Defense Summit 2026Order books are full and rates keep climbing. Two days with A&D leaders on what it actually takes to deliver.

Aviation Forum 2026

December 14, 2026

Munich, Germany

event

Rates are committed. The supply chain hasn't caught up. Two days in Munich on what it takes to close that gap.

Aviation Forum 2026Rates are committed. The supply chain hasn't caught up. Two days in Munich on what it takes to close that gap.

Ready to go from firefighting to flow?

See how Pelico orchestrates real-time execution across complex production environments.