Global aero-engine MRO provider
Protect MRO turnaround time, from induction to release
Repair plans rarely survive first inspection. Pelico shows you what each new finding or missing part costs in TAT, and how to win it back.

Pelico runs inside some of the world’s most demanding aftermarket operations, from engine and landing gear overhaul to component repair to spares distribution. Names withheld for confidentiality.
Airline engineering & maintenance division
Asia-Pacific component repair shop
Landing gear overhaul operation
Global aerospace systems MRO network
Faster turnaround, fewer shortages, dates that hold
Past Pelico deployments have delivered:
Turnaround time
-42%
Repair cycles shortened, freeing capacity and cash
Part shortages
-37%
Fewer modules waiting on a missing part
On-time delivery
+15%
Return-to-service dates met more consistently, through earlier detection
The execution gap
An MRO delay never stays on one module
In MRO, the work scope and the work that turns up on the bench are two different things, and the distance between them is too wide to close with ERP extracts and morning meetings. That distance is the execution gap: plans are built in systems that assume stability, and executed in conditions that offer none.
Nobody sees which units a late part holds up
A teardown finding or a slipped spare runs through every kit, module, and test slot that depends on it. The full exposure only shows once turnaround is already at risk.
The shop runs on four different lists
Repairs, spares sales, planning, and materials each track the same delay in their own system and spreadsheet. Recovery waits until someone walks the floor and lines them up.
The call comes after the bay sits idle
Which unit to expedite, which part to swap, which customer to call: those decisions wait for the daily meeting. By then the bay has sat idle and the date has moved.
How Pelico orchestrates MRO execution
Pelico is the Manufacturing Orchestration Platform that closes the execution gap. It reads what's actually happening across your shop systems, traces where a finding or a late part lands, and coordinates the response while the turnaround can still be saved.
Every team sees which units a part holds up
Pelico connects ERP, inspection, supplier portals, and the shop floor into one picture. It understands serialized assemblies, configuration changes, and kit dependencies, and traces a late part to every unit, module, and test slot it blocks.
One priority list for the whole shop
When a finding or a slip lands, materials, planning, and spares sales work it in the same place, on the same options: expedite, swap, or resequence. Ownership is explicit, and specialized AI agents take the defined steps while people make the calls, so bays keep moving.
Shop leaders see TAT risk before the customer asks
Pelico rolls turnaround risk up by unit, bay, and customer, so leaders can say what's late, why, and when it will ship. Not a report a planner spent the first hour of the day building. It's the difference between explaining a slipped TAT and protecting it.
FAQ
Findings are normal in MRO, not exceptions. When inspection adds work, Pelico updates the parts needed and the TAT exposure for that work order, so the plan reflects what’s actually on the bench instead of the original work scope.
Pelico traces which work orders each late spare is holding back and how much turnaround time it puts at risk. It then shows planners what to do next, like expediting the part, reallocating one from another work order, or resequencing the shop, before the date slips.
Most MRO teams use Pelico daily within about 12 weeks of kickoff. One aerospace transmission MRO operation cut missing parts by 72% within six weeks.
Related resources
Ready to make turnaround predictable?
See how aftermarket and MRO teams use Pelico to protect return-to-service dates, from component repair to full overhaul.