How Daikin Applied reached a 93% clear-to-build rate and de-risked its ramp-up

September 26, 2024

English

About this webinar

Daikin Applied, a US industrial equipment manufacturer, was ramping up production while parts costs rose and labor stayed short. One missing part could stop a line.

In this webinar, Pelico and Daikin Applied walk through how the team used its own data to secure its production plan, reach a 93% clear-to-build rate, and avoid line stops.